Annand Theatre
ITE had the privilege of working alongside consultant Richard Stuart & builder Condev Constructions to complete the build of the 1200 seat, Annand Theatre located within the Southport School. The project spanned over a year during COVID and included a complete fit out of Stage Lighting Bars including zero fleet angle hoists, Stage Masking Drapes, Motorised Projection Systems, Winched House Light Battens, Cabling Infrastructure and Technical Panels.

Project Overview
ITE had the privilege of working alongside consultant Richard Stuart & builder Condev Constructions to complete the build of the 1200 seat, Annand Theatre located within the Southport School. The project spanned over a year during COVID and included a complete fit out of Stage Lighting Bars including zero fleet angle hoists, Stage Masking Drapes, Motorised Projection Systems, Winched House Light Battens, Cabling Infrastructure and Technical Panels.
Scope of Machinery & Infrastructure
Technical scope and system installations carried out by ITE:
- FOH & Fixed ITE LX Ultra Stage Lighting BarsIncluded
- Zero Fleet Angle Hoists & Hand Pendant ControlsIncluded
- Motorised Projection System & Scenery BattensIncluded
- Drapes Package, House Winches & AV CablingIncluded
Collaboration & Safety FeaturesCompleted in collaboration with consultant Richard Stuart and builder Condev Constructions, featuring 500kg zero fleet angle hoists, 500kg entertainment hand winches, complete AV cabling infrastructure, and technical panels.
Detailed Technical Implementation
ITE had the privilege of working alongside consultant Richard Stuart & builder Condev Constructions to complete the build of the 1200 seat, Annand Theatre located within the Southport School.
The project spanned over a year during COVID and included a complete fit out of Stage Lighting Bars including zero fleet angle hoists, Stage Masking Drapes, Motorised Projection Systems, Winched House Light Battens, Cabling Infrastructure and Technical Panels.
The Fly System works included two Front of House ITE LX Ultra Lighting Bars motorised via 500kg zero fleet angles hoists operated via hand pendant controller. Five fixed ITE LX Ultra stage lighting bars, Motorised projection screen via zero fleet angle hoist, an array of scenery battens and a full drapes package including filled cloth cyclorama, theatre wool tabs, legs and borders and a beautiful theatre velvet house curtain. Nine house light battens were also included over the auditorium winchable via multiple 500kg entertainment hand winch.
ITE’s works also included rough in and fit off of all AV cabling infrastructure and technical panels.
Project Gallery








