Bentleigh Secondary College
ITE had the privilege of working alongside consultant Studio Entertech, builder Merkon Constructions & the school to complete the build of the 500 seat Performing Arts Centre

Project Overview
ITE had the privilege of working alongside consultant Studio Entertech, builder Merkon Constructions & the school to complete the build of the 500 seat Performing Arts Centre
Scope of Machinery & Infrastructure
The project spanned over a year and included a complete fit out of Stage Lighting, Audio Visual, Drapes & Motorised Linesets:
- 7 Motorised Scenery BattensIncluded
- 3 Motorised Auditorium Lighting TrussesIncluded
- 4 Motorised ITE LX Ultra Lighting Bars & House CurtainIncluded
- Zero Fleet Angle Hoists & Chain HoistsIncluded
- Complete AV Installation & DMX NetworkIncluded
Collaboration & DeliveryITE had the privilege of working alongside consultant Studio Entertech, builder Merkon Constructions & the school to complete the build of the 500 seat Performing Arts Centre
Detailed Technical Implementation
The project spanned over a year and included a complete fit out of Stage Lighting, Audio Visual, Drapes & Motorised Linesets.
The Fly System works included 7 motorised scenery battens, 3 motorised auditorium lighting trusses, and 4 motorised ITE LX Ultra Lighting Bars. The fly system also included a motorised house curtain. Motorisation was provided by Zero Fleet Angle Hoists and chain hoists. A full set of drapes was also installed as part of ITE’s works including ITE IFR Theatre Velvet house curtain & valance, ITE IFR theatre wool borders, legs, and tabs, a filled cloth cyclorama.
The Audio-Visual Installation consisted of technical infrastructure, audio console, system and stage boxes, FOH speakers, AV presentation system, vision system, paging system and stage lighting system including complete DMX network.