Projects/Institutional & Performing Arts

Crown Perth Stage Lift Refurbishment

ITE had the privilege of working alongside Crown Perth to refurbish their existing stage lift. The existing lift was 20+ years old and featured traditional screw jack lifting mechanisms and integrated counterweight system. ITE were tasked with replacing the lift during the theatre’s COVID shutdown. ITE worked under strict deadlines and upgraded the lift to a new SERAPID LinkLift System. ITE’s works included a brand-new control system with safe edge, E-stop & fall protection barrier integration, multiple control positions, various pre-set stop positions and a live & static load capacity of 18 tonne.

Crown Perth Stage Lift System
Crown Perth Stage Lift

Project Overview

ITE had the privilege of working alongside Crown Perth to refurbish their existing stage lift. The existing lift was 20+ years old and featured traditional screw jack lifting mechanisms and integrated counterweight system. ITE were tasked with replacing the lift during the theatre’s COVID shutdown.

Scope of Machinery & Infrastructure

Technical scope and system installations carried out by ITE:

  • New SERAPID LinkLift System UpgradeIncluded
  • Brand-New Control System with Multiple PositionsIncluded
  • Safe Edge, E-Stop & Fall Protection BarriersIncluded
  • Pre-Set Stop Positions & 18 Tonne CapacityIncluded

Collaboration & Safety FeaturesUpgraded under strict deadlines with built-in safety systems: safe edge, E-stop & fall protection barrier integration, multiple control positions, and various pre-set stop positions.

Detailed Technical Implementation

ITE had the privilege of working alongside Crown Perth to refurbish their existing stage lift.

The existing lift was 20+ years old and featured traditional screw jack lifting mechanisms and integrated counterweight system.

ITE were tasked with replacing the lift during the theatre’s COVID shutdown.

ITE worked under strict deadlines and upgraded the lift to a new SERAPID LinkLift System.

ITE’s works included a brand-new control system with safe edge, E-stop & fall protection barrier integration, multiple control positions, various pre-set stop positions and a live & static load capacity of 18 tonne.

Project Gallery

Crown Perth Stage Lift - View 1
Expand
SERAPID LinkLift System Detail
Expand
Stage Lift Control System Integration
Expand
Fall Protection Barrier & Safety Edges
Expand
Stage Lift Multiple Control Positions
Expand
SERAPID LinkLift Mechanism Installation
Expand
Under-Stage Mechanical Infrastructure
Expand
Crown Perth Stage Lift Overview
Expand