Crown Theatre Perth
ITE had the privilege of working alongside Crown Perth to refurbish their existing stage lift. The existing lift was 20+ years old and featured traditional screw jack lifting mechanisms and integrated counterweight system.
ITE were tasked with replacing the lift during the theatre’s COVID shutdown. ITE worked under strict deadlines and upgraded the lift to a new SERAPID LinkLift System.
ITE’s works included a brand-new control system with safe edge, E-stop & fall protection barrier integration, multiple control positions, various pre-set stop positions and a live & static load capacity of 18 tonne.